Zum Inhalt springen

Understanding Duty Cycle Before You Buy An Inverter Welder

Aus Test

The practical difference comes down to what a machine can draw and sustain. A single-phase supply has a ceiling on how much continuous power it can deliver before tripping breakers or overloading domestic wiring, which is why the highest-output welding and cutting equipment is frequently three-phase only, or offers noticeably better duty cycle performance when run on three-phase. For workshops without an existing three-phase supply, bringing one in usually means an electrician and, in some cases, an application to the local distribution network operator.

Cutting capacity is usually described in terms of clean cut and maximum cut thickness, and the two are worth distinguishing. Clean cut is the thickness a machine handles with a good edge finish and reasonable speed, while maximum cut is the thickest material the machine will get through at all, usually slower and with a rougher edge. Buying with your typical material thickness in mind, rather than the thickest job you might occasionally face, generally gives a better day-to-day result.

Every workshop is different, so rather than relying on general advice, it's worth getting your own set-up properly assessed. A system that works well for one shop can be quite wrong for another with different ventilation, floor space or process mix, and an on-torch extraction option, such as those available for Fronius torches, suits a different layout to a fixed overhead hood.

The abrasive material itself matters as much as the shape. Discs formulated for steel typically contain aluminium oxide, while stainless steel usually calls for an inox-rated disc that's free from iron, sulphur and chlorine contaminants that could otherwise cause surface corrosion on the stainless. Aluminium and other soft, non-ferrous metals need their own dedicated abrasives too, since standard steel discs tend to clog quickly and produce a poor finish on softer materials.

Duty cycle is one of the most misunderstood figures on a welder's spec sheet, yet it tells you more about real-world usability than the headline amperage does. It's expressed as a percentage over a ten-minute period at a given output, so a machine rated at 30% duty cycle at its maximum amperage can run for three minutes out of every ten at that setting before it needs to rest and cool.

MIG (metal inert gas) welding feeds a continuous wire electrode through a gun, Tec Products Thirsk shielded by a gas supply, which makes it fast and relatively forgiving for general fabrication, sheet steel and repair work. Jasic's MIG range is one of the more popular starting points here, covering entry-level compact units through to higher-output machines as work scales up. TIG (tungsten inert gas) uses a non-consumable tungsten electrode with a separate filler rod, giving a slower but tidier result that's favoured for thinner materials, aluminium and stainless steel where finish quality matters. MMA, or stick welding, strikes an arc from a flux-coated electrode and needs no shielding gas at all, which makes it the most portable option and a common choice for outdoor or on-site work on thicker steel.